Check 01 Charging stations

Requirements:

For on-site commissioning, all charging stations must be "online" (i.e. have an internet connection) and have the latest software version. Ideally, they should already be activated on the Eponet portal.

If the charging stations are not online two working days before the Eponet commissioning date, the appointment will be cancelled and a new one will have to be arranged. If the charging stations are not online on site, the time required for the additional work or any return visits will be charged separately at cost. The same applies if commissioning is not possible

due to incorrect software versions. In addition to the make and model, we also need the serial number and which serial number has been installed at which parking space number (or location). Please do not mix up serial numbers. It is best to create a list (not handwritten to avoid errors) with:

  • Brand
  • Model
  • Serial number
  • Power (e.g. 22kW or 180kW, etc.)
  • Parking space number/address

The charging stations must be online 2 days before the Eponet appointment. We recommend a flat-rate data package with at least 10/5 Mbits. Please note: If you have more than 4 charging stations and Eponet load management, the data package must be larger than 10/5 Mbits!