Skip to main content

Anton Häfliger AG - 6210 Sursee

Administration and billing solution with load management

Bildschirmfoto 2025-04-08 um 15.43.22.jpg

Project description:

Creation of Sursee charging park with DC & AC charging points. Load management.

Administration and billing

2x DC charging points Kostad 360 kW
2x AC charging points Kostad 43 kW
Eponet GLM3 Load management
Peak shaving

Completion in 2024

Impressions:

Bildschirmfoto 2025-04-08 um 15.48.33.jpg

Bildschirmfoto 2025-04-08 um 15.47.57.jpg

Bildschirmfoto 2025-04-08 um 15.45.40.jpg

Bildschirmfoto 2025-04-08 um 15.47.20.jpg

Bildschirmfoto 2025-04-08 um 15.56.22.jpg

 

Peak shaving Eponet GLM3

Image left side before / right side after peak shaving with GLM3. The set maximum value in kW is no longer exceeded.

Eponet LM Peak Shaving.jpg