Transport logistics E-mobility in transport logistics. Better and more sophisticated solutions with Eponet.These references are a selection from a number of projects. Dreier AG Transporte Logistik - 4622 Egerkingen Management and billing solution with load management Project description: Construction of the Egerkingen charging park with a new transformer station and DC & AC charging points. Load management at two locations in Egerkingen. Management and billing for the Oberentfelden and Suhr sites Various DC charging points: Siemens, Kostad, Temes; various AC charging points: Volvo Garo 43kW / Etrel 22kW; Eponet load management from the substation; peak shaving Completion in 2024 / Expansion underway (as of April 2025: 25 charging points at 4 locations) Impressions: Blöchlinger AG - 8732 Neuhaus SG Management and billing solution with load management Project description: Construction of a charging park with a transformer station and 4 DC charging points 4x DC charging points, Kostad 360 kW , Eponet GLM3 load management from the transformer station, peak shaving Completion in 2024 Impressions: Anton Häfliger AG - 6210 Sursee Management and billing solution with load management Project description: Development of the Sursee charging park with DC & AC charging points. Load management. Management and billing 2x DC charging points Kostad 360 kW 2x AC charging points Kostad 43 kW Eponet GLM3 load management Peak shaving Completion in 2024 Highlights:   Peak shaving Eponet GLM3 Image: left side before / right side after peak shaving with GLM3. The set maximum value in kW is no longer exceeded. F. Stuber Transporte AG - 6343 Rotkreuz Administration and Billing Solution Project description: Construction of the Rotkreuz charging park with 26 DC and AC charging points. Management and billing 10x EVTEC DC charging points with up to 384 kW 16x Autel 22 kW AC charging points Completion in 2024 / Extensions in 2025 Impressions: Hasler Transport AG - 8570 Weinfelden Administration and billing solution with load management, smart metering, RFID extension Project description: Creation of Weinfelden charging park with DC charging points. Administration and billing Eponet GLM3 load management Eponet RFID reader for charging stations without RFID function Peak shaving Smart metering for ZEV 2x DC charging points EVTEC 250kw Completion in 2025 Impressions:   DB Schenker - 8422 Pfungen Administration and billing solution with load management Project description: Creation of DC and AC charging points, Plug'n Charge function at Heliox dispenser charging stations 2x DC charging points Siemens SiCharge 360 kW 3x DC charging points Heliox Flex 180 kW 3x AC charging points Easee Charge 22 kW Eponet GLM3 load management  RFID charging with billing (Eponet Roaming) Completion in 2025 Impressions: Pictures taken during commissioning – barrier tape in place as the site had not yet been opened to the public at the time the photo was taken.